

Sun Bathroom
This remodel of the Master Bathroom left most of the original floorplan in place. Because of the condo floor, we raised the entire floor of the room about 2 inches to accommodate the roll-in shower. A slight ramp in the hallway, modified vanity, and a larger shower area were the only big changes here. New tiles, updated fixtures and lighting complete the remodel.
Status
Designed, July-Aug 2009
Construction Completed, Mar 2010
Location
Sun City Center, FL
Client
Name Withheld, Program of the Veterans Administration
Contractor
Home Safe, LLC, Tampa